1 2x3 bridge with 5 spans and 131 meters in length between Ataşehir East and West Regions and Anatolian highway
1 2-span, 60-meter long, 3-lane bridge junction in the Ataşehir West region of the D100 connection road and
The 2x3 connection roads of these tunnels have been successfully completed.